Trent Valley Four Tracking (TV4)
Acting as Principal Contractor to Network Rail for all S&T enabling work for TV4 project. Rail Tech integrated an appointed Contractors Responsible Engineer and self-managed project team within the site offices. Total of 40 staff present on-site with a project total of 58,288 hours to date. Awarded the delivery all 4 stages of W179 installation works.
Client
Network Rail
Project Value
£1.7 Million to date
Duration
Sept 2007 – April 2009
Activities Undertaken
Installation of HPSS/Hy-drive Point machines
Signalling cable diversion works
24 hour Signalling fault cover to minimize project delay
Installation of new signal heads/banner repeaters/track circuits/axle counters.
Re-positioning of location cases
Location base construction/Hard standings
SMTH enabling works
Signal Works Testing support
Cable slewing/running Trough route works
Point Heater installation/Station Lighting